September 2002 - Picture 1
The concrete walls for the elevator are poured.
September 2002 - Picture 2
Another view of the foundation.
September 2002 - Picture 3
Bottom layer of asphalt has been poured for the road.
September 2002 - Picture 4
Site.
September 2002 - Picture 5
TMC slab.
September 2002 - Picture 6
Foundation.