August 2003 - Picture 1 Panoramic view showing progress to August.
August 2003 - Picture 3 New HVAC units.
August 2003 - Picture 4 Drywalling and mud work almost complete for the operations hall.
August 2003 - Picture 5 Maintenance access stairs.
August 2003 - Picture 2 Walking the generator with the help of the crane to the back of the building.
August 2003 - Picture 7 Another shot of the generator installation.
August 2003 - Picture 10 Turning the corner with the generator.
August 2003 - Picture 9 Opps, we had to turn the generator around.
August 2003 - Picture 6 Concrete pad for the generator.
August 2003 - Picture 12 Home sweet home for the generator (dubbed "Big Alice").
August 2003 - Picture 13 A scenic view from inside the steel framing of the tower.
August 2003 - Picture 14 A view of our neighbors across from the TMC.
August 2003 - Picture 16 Installation of one heavy duty roof.
August 2003 - Picture 17 Scaffolding going up around tower.
August 2003 - Picture 20 A view of the rear of the TMC - including the newly installed generator.
August 2003 - Picture 21 View of the front entry and tower construction.
August 2003 - Picture 22 Applying the corner molding to the polished block corridor.
August 2003 - Picture 23 View of the lobby looking out the front entrance.
August 2003 - Picture 15 Landscaping the hillside behind the TMC.
August 2003 - Picture 24 The hillside is seeded and ready for rain.