TMC Construction for October 2003

January 2004 December 2003 November 2003 October 2003 September 2003 August 2003 July 2003 June 2003 May 2003 April 2003 March 2003 February 2003 January 2003 December 2002 November 2002 October 2002 September 2002 August 2002 July 2002 June 2002 May 2002 April 2002 March 2002 February 2002
Click on the thumbnail images to view full size images.
October 2003 - Picture 1 Setting up to brick the NYSP side and tower.
October 2003 - Picture 2 Getting the power hooked for all of the outlets and switches.
October 2003 - Picture 3 Westchester County offices.
October 2003 - Picture 5 Delivering the gas tank.
October 2003 - Picture 4 Setting the gas tank into the ground on a concrete pad.
October 2003 - Picture 6 Panoramic view showing progress up to October.
October 2003 - Picture 7 TMC side showing back of building.
October 2003 - Picture 8 NYSP side showing back of building.
October 2003 - Picture 9 Installing the supports and network conduits for the raised flooring.
October 2003 - Picture 10 A view of the front of the TMC showing the tower.
October 2003 - Picture 11 Hot water tank for the TMC being installed.
October 2003 - Picture 12 Construction of a landscape wall.
October 2003 - Picture 13 Engine for the generator.
October 2003 - Picture 14 Installed flooring for the TMC Control room.
October 2003 - Picture 15 Roadside wall construction.